Tahunanui Beach Carpark

CJ Asphalt were awarded the contract by Downer supply and lay 25mm asphalt to overlay the existing failing chip sealed car park area at the Tahunanui beach.

The scope included:

  • Site setout
  • Milling of existing high areas and key into existing kerb and channel
  • Asphalt pre-levelling
  • Supply and apply an emulsion tack-coat
  • Supply and lay of 25mm of asphalt to the prepared pavement
Tahunanui Beach Carpark

Check out our similar case studies:

Mitre 10 Demolition

CJ Industries were awarded the demolition of the local Mitre 10 Motueka and construction of the new building foundations and car park. Scope included: Demolition of existing buildings and sort materials for recycling Excavate building foundations and prep new building floor with laser machine control Construct pavement for new asphalt car park including kerb and…

See Project
Saxton Fruit - Building Slab

CJ industries were contracted to construct earthworks, drainage and concrete slab for Saxton Fruit in Nelson. The scope included: Installation of stormwater, sanitary sewer and reticulated water for new building Supply level and compact sub-base Installation of precast retaining wall Supply and install formwork, reinforcing mesh and tie Supply place and cure 2500 M2 concrete…

See Project

Check out our related products:

Roading

CJ Industries Ltd have specialist roading crews with the latest in machine control to construct all types of roading projects within land development or infrastructure projects.

Read more
Chip-seal

First coat chip seal is a very cost-effective option that will provide customers with a course surface that not only preforms well but looks great too.

Read more

Get in touch