CJ Industries were elected head Civil Contractor to build the new NPD Fuel Station in Nelson central. There was a critical path that had to be meet on this job which involved the station being open before a certain date which was achieved. The scope was comprehensive and involved the following:
- Demolition of existing structures
- Earthworks
- Civil and drainage construction
- Traffic and pedestrian management
- Excavation of main tank pit and field line, power trenches
- Construction of precast retaining wall and footings
- Construction of Concrete forecourt
- Construction of Asphalt yard
- Construction of kerb and channel
- Construction of 2 industrial vehicle crossings
- Landscaping
Check out our similar case studies:
CJ Industries were awarded the contract to build a 16-lot subdivision at 10 Daelyn Drive Nelson and completed all works from start to finish including: GPS set out and machine control Bulk earthworks All drainage work including sub soil, sewage, stormwater and reticulated water Connection to council reticulated system Facilitation of power and communication contractors…
See ProjectCJ Industries were the civil works contractor on the award Saltwater Creek Bridge Replacement Project for the Nelson City Council. We provided the onsite project management as well as traffic management which involved the challenge of working adjacent to the main road and the entrance to Nelson city and a very tight site construction area.…
See Project