CJ Industries looked after the design and construction of a new driveway in Motueka Quay. This was a high-profile job incorporating multiple styles of concrete and required a very high standard finish.
When the driveway design was finalised CJ Industries set to work installing drainage and kerb and channelling. The surfaces were then prepped and finished in coloured exposed aggregate concrete. The last item to be installed was the plain concreted vehicle access crossing. This must be constructed to the specifications of the TDC vehicle access crossing consent and any work outside the property road boundary requires a traffic management plan (TMP). CJ Industries have the personal and resources to apply for and carry out the TMP and are also on the approved access crossing installers list with Nelson City Council and Tasman District Council.
The scope of job included:
- Design of drainage, and decorative concrete surfaces
- Construct drainage solution
- Lay 90m of nib kerb
- Prep and pour 525 M2 of exposed aggregate and coloured concrete
- Concrete vehicle access crossing to TDC Specs
- Supply and levelling of topsoil and grass seeding
Check out our similar case studies:
CJ Asphalt were awarded the contract by Downer supply and lay 25mm asphalt to overlay the existing failing chip sealed car park area at the Tahunanui beach. The scope included: Site setout Milling of existing high areas and key into existing kerb and channel Asphalt pre-levelling Supply and apply an emulsion tack-coat Supply and lay…
See ProjectCJ Industries commenced work on Stage 4A of this Berryfield Subdivision in May 2020. Due to the successful outcome of this project and the relationships formed with the client and engineers this led on to a further five stages totaling over 300 Sections continuing to November 2023. This project helps address the growing need for…
See Project