Golden Bay Fruit Packers
Apollo Projects contracted CJ Industries to complete various parts of the new Golden Bay Fruit packers complex in Motueka. CJ Industries supplied over 4000 m3 of concrete and had a construction team work on elements of the building and site. This project has over 2 hectares under cover!
The scope included:
- Supply of over 4000 M3 of certified premix concrete
- Construction of external concrete slabs totalling over 2000 M2
- Earth works and sub grade development
- Construction of external roads finished in Chip seal, Asphalt and metal
- Construction of a 2500 M2 bin storage area
Check out our similar case studies:
CJ Industries were elected head Civil Contractor to build the new NPD Fuel Station in Nelson central. There was a critical path that had to be meet on this job which involved the station being open before a certain date which was achieved. The scope was comprehensive and involved the following: Demolition of existing structures…
See ProjectThis 120m long driveway required grading to shape with a crossfall into a 300mm deep swale drain. CJI Quarry basecourse was supplied, placed and compacted to ensure a sturdy base. A challenge of this project was the steep grade of the driveway, CJI safely and efficiently completed the project which delivered a long-term solution for…
See Project