Fairfield Coolstore Slabs

CJ Industries were approached to construct two new concrete slabs to accommodate cold stores for an orchard.  CJ Industries was the obvious fit for this job as we looked after the complete project from removing orchard trees right through to finishing the concrete slab.

The scope included:

Remove orchard trees

Strip topsoil and stockpile

Construct sub-base with certified CJ Industries quarry rock

Setout slab lines and levels

Supply and install formwork, reinforcing mesh and ties

Supply place and cure 1200m2 slabs

Expansion cutting

Form and finish metal road around perimeter of the cold stores

Fairfield Coolstore Slabs

Check out our similar case studies:

Falcon Brae - Stonefly Lodge

CJ Industries were awarded the contract to complete earthworks and road formation at a new 5 star luxury fishing lodge in the Motueka Valley. This project was completed over 3 years in a challenging location with the need to consider many sub-contractor movements all working to a tight schedule: The scope of this project: Erosion…

See Project
Kaiteri Road Construction

CJ Industries won the contract to construct a new road into a private right of way in Kaiteriteri, Abel Tasman. The scope included: Arborist work clearing native and pine trees Cutting a new road through granite rock Supply and installation of culvert pipes Constructing a new road to local council specification from CJ’s certified basecourse…

See Project

Check out our related products:

Premix concrete supply

Motueka Premix Concrete is an independent ready-mix concrete manufacturer servicing Nelson Tasman districts.

Read more
Concrete Construction

CJ concrete construction includes commercial floor slabs buildings, yard slabs, driveways, cow sheds, roads, and foot paths.

Read more

Get in touch